
EA Automation Engineering Electrical
- High Voltage Operation Responsibility in Transformer Substations,
- Low and Medium/High Voltage Maintenance and Repair Works,
- Construction of Low and Medium/High Voltage Power Transmission Lines,
- Installation of Pole-Type and Building-Type Transformer Substations,
- Installation of Lightning Protection Systems (Paratoner),
- Installation of Grounding Systems,
- Installation of Low Current Systems such as Fire Detection and Alarm Systems, Public Address, Camera, Data, and Telephone Lines,
- Thermal Camera Measurement and Reporting,
- Grounding Resistance Measurement and Reporting,
- Harmonic Measurement and Reporting,
- Illuminance (Lighting Intensity) Measurement and Reporting,
- Design and Project Planning for Internal Installations, Low Current, Lightning Protection, Grounding, Power Transmission Lines, and Transformer Substations,
- Power Factor Correction (Compensation) Monitoring,
- Automation Projects,
- Monitoring of Low Voltage (LV) and Medium Voltage (MV) Subscription Procedures
<